New
Available
  • 532

Aluminum Formwork

  Quotation Needs Construction Drawings Introduction and Background of the Aluminum Formwork System   Improving Construction Quality Construction quality depends on good design and manufacturing. To keep the frame accurate with high-quality design and precise processing.

  • Color: Default Color
  • Size: Default Size
  • Origin: China
  • Usage: Default Usage
  • Type: Default Type
  • Efficiency: 99.9% Type
Category: Aluminum Formwork

Description:

 

Quotation Needs Construction Drawings

Introduction and Background of the Aluminum Formwork System

 

  • Improving Construction Quality
  • Construction quality depends on good design and manufacturing.
  • To keep the frame accurate with high-quality design and precise processing.
  • Ensure vertical and horizontal accuracy.
  • Prevent wallboard bulging and floor slab drooping during construction.
  • Maintain consistent frame quality, avoiding variations among builders.
  • Prevent flaws and cracks.

Reducing Construction Costs

  • Shorten the construction period.
  • Lower the cost of opening, gap treatment, and wall decoration.
  • Reduce costs for scaffolding, supports, and related materials.
  • Decrease construction waste and field cleaning costs.
  • Lower the cost of additional construction needs. 

Enhancing Field Construction

  • Ensure a safe construction period (4-6 days per layer).
  • Improve the construction ability of non-specialized workers.
  • Inspect drawings before construction to boost efficiency.
  • Ensure accuracy in placing cables and equipment.

 

Improving the Construction Site Environment

  • Reuse materials to reduce waste, protect the environment, save energy, and cut emissions, following national green construction regulations.
  • Maintain neat field management.

 

 

Top Products